Filings · Filter
NI 43-101 Technical Report
Recent NI 43-101 Technical Report filings across the small-cap and venture space.
← All filings NI 43-101 Technical Report (6)
| Company | Filing Type | Filed | Summary | Source |
|---|---|---|---|---|
| Surge Copper Corp. | NI 43-101 Technical Report | Jul 30, 2026 | Surge Copper Corp. (TSX-V: SURG) filed its NI 43-101 Technical Report and Pre-Feasibility Study for the Berg Copper Project in central British Columbia on July 30, 2026, prepared by Ausenco Engineering Canada and Moose Mountain Technical Services. The PFS delivers an after-tax NPV₈% of C$4.6 billion, an IRR of 24%, and a 2.9-year payback on initial capital of C$4.7 billion, underpinning a 28-year open-pit mine producing 8.6 billion pounds of copper equivalent. At a time of structural copper deficit, this is one of the largest undeveloped copper PFS results in Canada and positions Berg as a major institutional and potential strategic acquisition target. | Filing ↗ |
| Anteros Metals Inc. | NI 43-101 Technical Report | Jul 30, 2026 | Anteros Metals Inc. (CSE: ANT) voluntarily filed a NI 43-101 technical report (effective June 29, 2026; authored by Geoff Heggie, PhD, P.Geo.) for its Seagull Critical Minerals Project in Ontario, covering targets for natural hydrogen, helium, and platinum-group element (PGE) mineralization within the Midcontinent Rift intrusive complex. The report was filed proactively rather than in response to a material change or prospectus, providing investors independent technical validation ahead of the company's planned Phase 2 drilling mobilization. The Seagull Project's dual-commodity positioning—natural gas plus PGE-bearing magmatic sulphides—differentiates it from conventional junior miners and could attract cross-sector institutional interest. | Filing ↗ |
| Resouro Strategic Metals Inc. | NI 43-101 Technical Report | Jul 29, 2026 | Resouro Strategic Metals Inc. (TSX-V: RSM; ASX: RAU) filed an NI 43-101 Preliminary Economic Assessment technical report for the Tiros Titanium and Rare Earths Project in Minas Gerais, Brazil, dated July 29, 2026 (effective July 10, 2026), prepared by Norda Stelo Inc. The PEA outlines an after-tax NPV₈% of US$714.9 million and an IRR of 44.2%, with the project combining titanium oxide and rare earth elements (REE) production in a jurisdiction with established mining infrastructure. Strong economics and dual-commodity REE+Ti positioning make this report a significant capital-markets catalyst for RSM as institutional interest in non-Chinese REE supply intensifies. | Filing ↗ |
| Lithium Africa Corp. | NI 43-101 Technical Report | Jul 29, 2026 | Lithium Africa Corp. (TSXV: LAF, OTCQB: LTAFF) received South African Section 11 consent on July 27, 2026, formally completing its 70% acquisition of Namli Exploration and Mining—holder of the 1,675 km² Springbok Lithium Project including a past-producing lithium pegmatite mine—and simultaneously filed a NI 43-101 Technical Report on SEDAR+ consolidating historical and company exploration data. A 3,500 m drill program is actively underway at Springbok. The dual catalyst of regulatory approval and an independent NI 43-101 technical report significantly de-risks the flagship asset and positions the company to attract institutional capital in a market hungry for quality early-stage lithium drill stories. | Filing ↗ |
| Canadian GoldCamps Corp. | NI 43-101 Technical Report | Jul 28, 2026 | Canadian GoldCamps Corp. (CSE: CAMP) filed an independent NI 43-101 Technical Report on SEDAR+ for its Mercator Gold Project — a 113-claim, ~58.6 km² property in the Caniapiscau District of northeastern Québec — on July 28, 2026. Filing was required upon Mercator becoming CAMP's primary mineral project after the company optioned it from Stelmine Canada Ltée for up to an 80% interest. Approximately 82% of 111 high-resolution samples returned gold above detection limits, validating the gold and critical minerals system as a drill-ready target. | Filing ↗ |
| Integra Resources Corp. | NI 43-101 Technical Report | Jul 28, 2026 | Integra Resources Corp. (TSX-V: ITR) filed a Feasibility Study and updated Life of Mine Plan NI 43-101 Technical Report for the operating Florida Canyon Gold Mine in Pershing County, Nevada, dated July 28, 2026 (effective May 31, 2026), prepared by Global Resource Engineering Ltd. and filed on both SEDAR+ and EDGAR. The study shows a 74% increase in Proven and Probable Mineral Reserves, a 17% rise in annual gold production, mine life extended to 2033, and after-tax free cash flow exceeding US$800 million (NPV US$601 million base case; US$723 million at spot gold ~$4,200/oz). For a producing TSX-V gold issuer, this scale of reserve upgrade and FCF projection materially enhances financing capacity and M&A optionality. | Filing ↗ |